STRATIGRAPHY 1 - Winkler Chimica

Bituminous waterproofing

Underground structure, externally waterproofed with hot-applied bituminous membrane

1 LEAN CONCRETE LAYER FOR FOUNDATION

2 PRIMER

Application by roller, brush, or spray of bituminous primer ECOIMPRIMER, total consumption 150–200 g/m².

3 HORIZONTAL WATERPROOFING

Realizzazione c Realized with elastoplastomeric bituminous membrane (BPP) applied hot, COVERBOND, with low-temperature flexibility down to –10 °C. The membrane is reinforced with non-woven polyester fabric stabilized with glass fibers, rot-proof.on membrana bituminosa elastoplastomerica (BPP) applicata a caldo COVERBOND, avente flessibilità a freddo – 10°C. La membrana è realizzata con armatura realizzata in tessuto non tessuto di poliestere da filo continuo stabilizzato con vetro, imputrescibile.

4 FOUNDATION ELEVATION STRUCTURE: CONSTRUCTED IN REINFORCED CONCRETE.

5 VERTICAL STRUCTURE WATERPROOFING

Realized with elastoplastomeric bituminous membrane (BPP) applied hot, COVERBOND, with low-temperature flexibility down to –10 °C. The membrane is reinforced with non-woven polyester fabric stabilized with glass fibers, rot-proof.

6 PROTECTIVE ELEMENT

7 BACKFILLING