Residential Roofing Project – Milazzo, Sicily

Instant Roof Waterproofing I Winkler 2000 Fast System

In this residential roofing project in Milazzo, the contractor needed a system capable of waterproofing and protecting the roof immediately after membrane installation – avoiding the traditional waiting time required for new bituminous membranes to oxidize.

By combining Coverextra with the WINKLER 2000 Fast System, the team eliminated oxidation delays entirely. The protective coating was applied right after installation, ensuring instant durability, reliable waterproofing, and a clean, long-lasting aesthetic finish from day one.



Project Goals and Challenges

The contractor needed to:

  • Waterproof the roof surface
  • Apply a protective coating immediately
  • Ensure long-term durability and an attractive finish
  • Avoid construction delays and additional costs

Under normal conditions, newly installed bituminous membranes require a waiting period of around six months before applying a protective coating. This oxidation phase prevents issues such as:

Detachment of the coating

Yellowing or discoloration

Poor adhesion

Oil migration


Such delays are incompatible with the fast-paced timelines of modern construction projects.


Perché attendere l’ossidazione della membrana è un problema

Le membrane bituminose di nuova produzione rilasciano sulla superficie degli oli di affioramento. Se un protettivo viene applicato troppo presto, questi oli compromettono l’adesione del rivestimento, causando:

  • Distacchi localizzati o diffusi della vernice.
  • Ingiallimenti antiestetici del colore scelto.
  • Migrazione degli oli che sporcano la finitura.

Senza una tecnologia specifica, il cantiere sarebbe rimasto bloccato per un intero semestre, esponendo la membrana nuda agli agenti atmosferici senza la protezione definitiva dei raggi UV.


Winkler Technical Solution

Winkler provided the ideal answer with the 2000 Fast System, specifically engineered to allow protective coatings to be applied right after membrane installation – without waiting for natural oxidation.

The system includes:

  1. An oil-blocking primer to prevent migration
  2. A coloured or reflective elastomeric protective coating
  3. Water-based, solvent-free technology
  4. The result is a roof that is stable, waterproof, and protected from day one.

Product Used and Their Features

Coverextra – Elastoplastomeric Bituminous Membrane

Costituisce lo strato impermeabile di base. È composta da bitume distillato modificato con polimeri, garantendo:

  • Elevata stabilità termica (ideale per il clima siciliano).
  • Flessibilità alle basse temperature e ottime proprietà meccaniche.

2000 Fast Primer

Made from distilled bitumen modified with elastoplastomeric polymers, synthetic compatibilizers, and inert fillers.

Technical Advantages:

  • High thermal stability
  • Flexibility at low temperatures
  • Superior mechanical performance
  • Long-term dimensional stability

2000 Fast System

A water-based primer formulated with lamellar-structured polymers.


2000 Fast

An elastomeric coating ideal for smooth or granulated membranes.

Features:

  • Resistant to water ponding
  • High elasticity
  • Excellent UV protection
  • Also available in a reflective version (Reflex) to enhance solar reflectance

Results Achieved

The roof in Milazzo was waterproofed and protected in a single installation phase, ensuring:

  • Continuous construction without downtime
  • Immediate weather protection 
  • Extended membrane lifespan
  • Superior aesthetic finish
  • Reduced long-term maintenance needs

FAQ – FREQUENTLY ASKED QUESTIONS

  • Why is waiting normally required before protecting a bituminous membrane?

Because membranes need time to oxidize, reducing oil migration that can cause coating detachment or yellowing.

  • Is it really possible to apply the protective coating immediately with the 2000 Fast System?

Yes. The primer blocks surface oils, enabling immediate coating application. 

  • Is the system suitable for roofs exposed to water ponding?

Yes. The elastomeric coating is designed to resist water ponding and full weather exposure.

  • Are the products safe for operators and the environments?

Absolutely. They are water-based, solvent-free, and low-emission – ideal for modern construction sites.

  • Can roof reflectance be improved?

Yes. The Reflex versions increase solar reflectance and can reduce surface temperatures by up to 50%.